設萬維讀者為首頁 廣告服務 技術服務 聯繫我們 關於萬維
簡體 繁體 手機版
分類廣告
版主:白夫長
萬維讀者網 > 軍事天地 > 帖子
美軍頭號大殺器,絕對震撼
送交者: 一劍破天 2016年07月10日18:42:45 於 [軍事天地] 發送悄悄話
Workers stand pose for a photo in the four-tube "quad-pack" built for the U.S. Ohio Replacement-class and U.K. Successor-class. General Dynamics Electric Boat Photo via US Navy

Workers stand pose for a photo in the four-tube “quad-pack” built for the U.S. Ohio Replacement-class and U.K. Successor-class. General Dynamics Electric Boat Photo via US Navy

WASHINGTON, D.C. — The Navy will present an updated Ohio Replacement Program cost estimate to the Defense Department later this summer and seek approval to move into detailed design and engineering work, the Program Executive Officer for Submarines said today.

The new ballistic missile submarine program will request a Milestone B decision from the Pentagon’s acquisition chief and the Defense Acquisition Board, and “coincident with that, we’re also producing a new cost estimate,” Rear Adm. Michael Jabaley said at an event co-hosted by the Center for Strategic and International Studies and the U.S. Naval Institute. He said the Navy is still working through this component cost position, of the lifecycle cost estimate, and is awaiting final approval of that dollar figure before presenting to the DAB.

A 2014 cost estimate put the program’s average follow-ship cost — ships two through 12, not including the typically most-expensive lead ship – at $5.2 billion, squarely in between the mandatory threshold of $5.6 billion and the target objective of $4.9 billion. Jabaley added that the 2014 cost estimate put the non-recurring costs – engineering work and building facilities to produce the subs – at $17.4 billion. Updated figures will be publicly released after the DAB approves the Milestone B decision, he said.

Jabaley said he views it as his responsibility to not only control costs for ORP but to actively seek ways to reduce cost.

“We need other ships beyond submarines. If I can’t control cost on the Ohio Replacement Program, we can’t build as many surface ships and attack submarines as we would like,” he said.

On the cost control side, he told reporters after the event that the Navy is talking to prime contractor General Dynamics Electric Boat about ways to reduce lifecycle costs for the program.

“We will aim to strongly incentivize cost reduction as a part of this detail design contract because, as everyone in acquisition knows, the time to reduce the cost of construction and ownership of the platform is as early in design as you can get it, and with the detail design contract starting later this year we have to incentivize that cost reduction now,” he said.

After releasing a request for proposals on Jan. 4 and receiving a response back on May 20, the Navy and Electric Boat are “in a very intensive review cycle right now” and will engage in “hardcore negotiations later this summer” in the hopes of signing a detail design contract by this fall.

“My goal is to award the contract by the beginning of the fiscal year, October 1,” Jabaley told reporters.
“It will be a challenge to get it done by then, just based on the timing, but I would say that the contract award process has our highest attention.”

On the cost reduction side, Jabaley said the Navy and industry are developing a Submarines Unified Build Strategy (SUBS) to find efficiencies in materiel acquisition and ship construction schedules between ORP and the Virginia-class attack submarines. Electric Boat and Newport News Shipbuilding are the only two yards that build both programs – and Newport News is the only yard that builds aircraft carriers – so between the three ship classes there could be opportunities to order common parts in larger quantities to achieve savings for example.

0%(0)
0%(0)
標 題 (必選項):
內 容 (選填項):
實用資訊
回國機票$360起 | 商務艙省$200 | 全球最佳航空公司出爐:海航獲五星
海外華人福利!在線看陳建斌《三叉戟》熱血歸回 豪情築夢 高清免費看 無地區限制
一周點擊熱帖 更多>>
一周回復熱帖
歷史上的今天:回復熱帖
2015: “高新6號”反潛機使中國躋身世界反潛
2015: 史無前例:台獨分裂分子幸災樂禍 肉麻
2014: “性都”東莞妓女人數超30萬 150元可叫
2014: 取消對日賠款要求和幾乎無條件釋放日軍
2013: 日本的傳統‘性外勞’
2013: 斯諾登身陷絕境 讓美國更加有了稱霸的
2012: 豫湘桂戰役時期為日軍帶路的慣匪彭春榮
2012: 開國上將肖華原來是這副面孔啊!
2011: 問個問題:報紙上點22的半自動步槍才要
2011: 日本人怕了:中國越來越強硬