设万维读者为首页 广告服务 技术服务 联系我们 关于万维
简体 繁体 手机版
分类广告
版主:白夫长
万维读者网 > 军事天地 > 帖子
美军头号大杀器,绝对震撼
送交者: 一剑破天 2016年07月10日18:42:45 于 [军事天地] 发送悄悄话
Workers stand pose for a photo in the four-tube "quad-pack" built for the U.S. Ohio Replacement-class and U.K. Successor-class. General Dynamics Electric Boat Photo via US Navy

Workers stand pose for a photo in the four-tube “quad-pack” built for the U.S. Ohio Replacement-class and U.K. Successor-class. General Dynamics Electric Boat Photo via US Navy

WASHINGTON, D.C. — The Navy will present an updated Ohio Replacement Program cost estimate to the Defense Department later this summer and seek approval to move into detailed design and engineering work, the Program Executive Officer for Submarines said today.

The new ballistic missile submarine program will request a Milestone B decision from the Pentagon’s acquisition chief and the Defense Acquisition Board, and “coincident with that, we’re also producing a new cost estimate,” Rear Adm. Michael Jabaley said at an event co-hosted by the Center for Strategic and International Studies and the U.S. Naval Institute. He said the Navy is still working through this component cost position, of the lifecycle cost estimate, and is awaiting final approval of that dollar figure before presenting to the DAB.

A 2014 cost estimate put the program’s average follow-ship cost — ships two through 12, not including the typically most-expensive lead ship – at $5.2 billion, squarely in between the mandatory threshold of $5.6 billion and the target objective of $4.9 billion. Jabaley added that the 2014 cost estimate put the non-recurring costs – engineering work and building facilities to produce the subs – at $17.4 billion. Updated figures will be publicly released after the DAB approves the Milestone B decision, he said.

Jabaley said he views it as his responsibility to not only control costs for ORP but to actively seek ways to reduce cost.

“We need other ships beyond submarines. If I can’t control cost on the Ohio Replacement Program, we can’t build as many surface ships and attack submarines as we would like,” he said.

On the cost control side, he told reporters after the event that the Navy is talking to prime contractor General Dynamics Electric Boat about ways to reduce lifecycle costs for the program.

“We will aim to strongly incentivize cost reduction as a part of this detail design contract because, as everyone in acquisition knows, the time to reduce the cost of construction and ownership of the platform is as early in design as you can get it, and with the detail design contract starting later this year we have to incentivize that cost reduction now,” he said.

After releasing a request for proposals on Jan. 4 and receiving a response back on May 20, the Navy and Electric Boat are “in a very intensive review cycle right now” and will engage in “hardcore negotiations later this summer” in the hopes of signing a detail design contract by this fall.

“My goal is to award the contract by the beginning of the fiscal year, October 1,” Jabaley told reporters.
“It will be a challenge to get it done by then, just based on the timing, but I would say that the contract award process has our highest attention.”

On the cost reduction side, Jabaley said the Navy and industry are developing a Submarines Unified Build Strategy (SUBS) to find efficiencies in materiel acquisition and ship construction schedules between ORP and the Virginia-class attack submarines. Electric Boat and Newport News Shipbuilding are the only two yards that build both programs – and Newport News is the only yard that builds aircraft carriers – so between the three ship classes there could be opportunities to order common parts in larger quantities to achieve savings for example.

0%(0)
0%(0)
标 题 (必选项):
内 容 (选填项):
实用资讯
回国机票$360起 | 商务舱省$200 | 全球最佳航空公司出炉:海航获五星
海外华人福利!在线看陈建斌《三叉戟》热血归回 豪情筑梦 高清免费看 无地区限制
一周点击热帖 更多>>
一周回复热帖
历史上的今天:回复热帖
2015: “高新6号”反潜机使中国跻身世界反潜
2015: 史无前例:台独分裂分子幸灾乐祸 肉麻
2014: “性都”东莞妓女人数超30万 150元可叫
2014: 取消对日赔款要求和几乎无条件释放日军
2013: 日本的传统‘性外劳’
2013: 斯诺登身陷绝境 让美国更加有了称霸的
2012: 豫湘桂战役时期为日军带路的惯匪彭春荣
2012: 开国上将肖华原来是这副面孔啊!
2011: 问个问题:报纸上点22的半自动步枪才要
2011: 日本人怕了:中国越来越强硬